My most complex job to date.
Two 50 gallon Apollo heaters, both serving different hvac units. Developed length of piping for domestic supply was balanced well enough that the heater on the left purged out the open t and p 10 seconds after the right purged. I sold this, total cost was around $8500, myself and another tech finished it in a day.
I still don't understand posting pictures on this forum, the picture is right side up on my desktop, and when I upload it, I see no way to right it.
Thanks for the help mods :)
I still don't understand posting pictures on this forum, the picture is right side up on my desktop, and when I upload it, I see no way to right it.
Thanks for the help mods :)
Comments
Post a Comment